Cartography

Douro's Inland Waterway 2020

The river nautical mapping project of Douro waterway (DWW) is integrated into the “Douro’s Inland Waterway 2020”, action under the management of Douro, Leixões and Viana do Castelo Port Administration (APDL) and is an essential project for strengthening the safety conditions of navigation on this route. The project carried out by Instituto Hidrográfico consisted of several stages, namely:

  • The hydrographic survey of the entire DWW;
  • The definition of the waterway;
  • The preparation of maritime marking projects;
  • The elaboration of river nautical cartography.

After its full implementation, it will allow a significant increase in navigation safety along a waterway of growing importance for the region and the country.

VND

Download

You can see metadata or download it via the Hidrográfico+ Portal Electronic Letters from Via Navigá do Douro or through the links provided below.

When downloading, you accept the conditions for using the nautical charts.

Estuary (From D. Luís Bridge to Crestuma-Lever Dam) Last updated: 03/25 - 31MAR2025

Albufeira de Crestuma (From Crestuma-Lever Dam to Carrapatelo Dam) Last updated: 12/23 - 31DEC2023

Albufeira de Carrapatelo (From Carrapatelo Dam to Bagaust Dam) Last updated: 12/19 - 31DEC2019

Albufeira da Régua (From Bagaust Dam to Valeira Dam) Last updated: 12/19 - 31DEC2019

Albufeira de Valeira (From Valeira Dam to Pocinho Dam) Last updated: 12/19 - 31DEC2019

Albufeira do Pocinho (From Pocinho Dam to Alva Barca) Last updated: 12/19 - 31DEC2019

All rights reserved. These cells are protected by copyright. Any reproduction or adaptation of the part or the whole of this document, in analog or digital format, shall require express authorization from the Instituto Hidrográfico.

Make sure you have your cells updated. Please refer to the Monthly Group of Notices to Mariners.

15Views Icon

2024-10-02